    • What are Work Packages?

      Work packages are subsets of the asset network that allow specific assets to be allocated with a particular task that...

      September 2nd, 2022 102 views 0 likes

    • Create a Work Package in Tree SMART

      Making a work package involves setting up the package details, adding specific assets to the package, and then selecting the work...

      September 2nd, 2022 25 views 0 likes

    • Assign a Tree SMART Work Package

      Work packages can only be downloaded by one user at a time. Packages can be specifically allocated to a team...

      September 2nd, 2022 20 views 0 likes

    • Report on Assets in a Tree SMART Work Package

      Run a work package report to get more details information about the work that has been completed, abandoned or is...

      September 29th, 2022 16 views 0 likes

    • Split a Tree SMART Work Package

      A package can allow you to work across the whole network if the total is fewer than 4,000 assets. However,...

      September 30th, 2022 17 views 0 likes